| |
Administration
Highway
Utilities
Stormwater

|
 |
Board of Public Works
Board of Public Works
The Board of Public Works was established in 1973 as a result of an act of the State Legislature. The Board of Public Works is elected by North Attleborough residents and consists of three members, each serving a three-year term. The Board is responsible for the setting policies for public works infrastructure such as planning, building and maintaining roads, bridges, water distribution and sewer collection systems, water treatment and wastewater treatment plants, sidewalks, drainage facilities, vehicles and equipment.
The Board meets on the second and fourth Wednesday of each month at 6:00p.m. at the Department of Public Works facility located at
49 Whiting Street. The public is invited to attend these meetings.
Mr.
Donald Cerrone,
Chairman
Mr. Donald A. Cerrone was newly elected to the Board of Public Works in April 2011.
Mr.
Steven M. Cabral, P.E., Vice Chairman
Mr. Cabral was reelected to the Board of Public Works in April 2012. Mr. Cabral is a professional engineer and has been on the Board since 1996.

In memory of
Robert C. Norton
Chairman of the Board of Public Works
The field of Public Works has suffered a great loss in the passing of one of its pioneers and leaders, Bob Norton. Bob died Saturday, June 19, 2010 and was currently serving as the Chairman of the Board of Public Works. Bob was instrumental in adopting a number of progressive policies and programs during his role as a Board Member.
Bob has been a dedicated member of the Board of Public Works since 1999. Bob also was employed as a senior resident field representative for Weston & Sampson in Peabody for the past 15 years.
Bob was a man with high ideals and an eye for the future. Bob will be terribly missed and his work will leave a lasting impact on the Town of North Attleborough for years to come.

|

|